INDUSTRY NEWS
Sabah Approves 24-Hour Operations at Sepanggar Bay Container Port as Volumes Climb; Expansion 68% Complete
2026-10-20 / Ports
Approved — but round-the-clock needs the whole chain
Malaysia's Bernama news agency reported on 18 October that the Sabah state cabinet has approved 24-hour operations at Sepanggar Bay Container Port (SBCP) to relieve logistics congestion. Deputy Chief Minister III Ewon Benedick, who holds the industrial development and transport portfolios, was candid with reporters in Kudat: the approval alone won't move boxes if the ecosystem isn't ready — many local depots and factories still close at 5pm, and a port working through the night can't fix that on its own. A monthly task force is now tracking ten interim measures, including a temporary trailer parking zone at the Kota Kinabalu Industrial Park (KKIP).
Congestion is what growth looks like
His numbers explain the pressure: Sabah Ports handled 532,391 TEU in 2025, up 6.07% year on year, and SBCP accounted for 74.6% of it — 396,964 TEU. In the first nine months of 2026, SBCP alone moved 416,854 TEU, on track to beat last year comfortably. The port's physical expansion has reached 68.1% completion and is scheduled to finish in October 2027. The minister called the congestion a positive sign of economic activity. Fair enough — but for a shipper waiting on boxes, congestion is still congestion.
What it means for East Malaysia cargo
SBCP is the container gateway for Sabah: cargo for Kota Kinabalu, Tawau and Sandakan moves through it. Once night operations genuinely take hold, shippers should see more flexibility in yard and gate windows during peak weeks. But the minister gave no hard start date — depots, hauliers and factories have to move in step, and that takes time.
Practical note
For now, keep existing transit-time buffers for East Malaysia deliveries and don't price 24-hour operations into your plans yet. When night shifts at the port actually ramp up, we will update our East Malaysia lane guidance. The early indicator to watch is haulage turnaround once the KKIP parking zone opens.
Source: Bernama report (18 October 2026, carried by The Edge Malaysia). The full rollout date for 24-hour operations is subject to announcements by the Sabah state government and the port operator.
Ruixin · Smart online consultation
Start with your shipment.
Tell us the origin, destination and cargo details, and we will confirm a fitting arrangement.
LET’S CONNECT
Your next move.
A good conversation away.
Have a route in mind, or still comparing options?
Tell us what you need to move.